Project Description

The contract involved fitting out the main fabrication bay with a 110 metre long free standing gantry suitable for a safe working load of 20 tonnes complete with a powerfeed system. The cranes installed were fully reconditioned and consisted of a 20 Tonne, 16 Tonne and two 10 Tonne safe working load twin beam cranes with 19 metre spans.

Technical Cranes service also included for the design and installation of the foundation pads for the gantry columns to sit on.

Crane Rails & Accessories Crane Rails